Construction of heating system network from thermal power plant
The City of Zajecar currently has in function two boiler rooms which expend liquid fuel and one under construction also on liquid fuel. The existent two boiler rooms meet the needs of the City with the help of the boilers located in the Beer Factory. Subsequent to completion of the third boiler room, the City will gravely satisfy the present heating energy requirements. Heating system network will be constructed from the thermal power plant up to two existent heating system sources and the one under construction , and a distribution heating system network up to all consumers. The existent heating system network supplies near 3.718 connections of 14.859 flats. 70% of the present heating system network is older than 30 years and it has reached the phase of partial reconstruction.
The construction of a new distribution network, 4.190m long is planned. The equivalent diameter of the new distributive network should be DN200, which would enable the connection of 3.000-5.000 households to the heating system network and double the number of users.
Likewise, the reconstruction of the current distribution network, long, is planned. The equivalent diameter of the planned reconstructed distributive network should be DN250.
The entire document can be downloaded here